SCHEMES APPROVED IN THE DEPARTMENT of ENVIRONMENT HERITAGE & LOCAL GOVERNMENT WATER SERVICES INVESTMENT PROGRAMME 2005 - 2007
Shanganagh/Bray Main Drainage Scheme (DBO)WWTF (Contract 1)
DESCRIPTION Upgrading to meet EU Urban Waste Water Directive for sewage effluent from Shanganagh and Bray and the treating of sewage sludge
STATUS The pre-selection of tenderers was completed end of Feb 2006 and five applicants have been shortlisted to tender for Contract No 1 DBO
Bray-Shanganagh Transfer Pipeline (Contract 2)
DESCRIPTION New Foul Rising Main between Bray and Shanganagh to transfer flows from Bray Catchment for Treatment including Construction of 5000m3 Storage Tank on old Bray Golf Club lands(Contract 2)
STATUS Draft Documents approved by DLRCCWicklow / Bray TC Part 8 planning for storm storage tank completed and given planning approval. Await Wayleaves and other planning issues. Due to begin before July 2007
Dun Laoghaire Drainage Scheme (Contracts 4A/B) –Coliemore Drainage & Water Scheme
DESCRIPTION Scheme to eliminate sea outfalls
STATUS Contractor has been appointed and scheme is scheduled to commence May/June 2006.
Shanganagh Catchment Works
DESCRIPTION Works resulting from Shanganagh Catchment Study
STATUS Approved to enter Planning by DEHLG requires appointment of new Consultant Preliminary Report from RPS-MCOS Ltd with DEHLG for approval.
Dun Laoghaire Drainage Scheme (Contract 4D)
DESCRIPTION Works resulting from Catchment Study including Overflows and associated works West pier catchment
STATUS Approved to enter Planning by DEHLG requires appointment of new Consultant Preliminary Report from PHMCC Ltd with DEHLG for approval.
Carysfort Maretimo Stream Improvement Scheme
DESCRIPTION Scheme to relieve flooding on stream
STATUS Preliminary Report Complete and await DoEHLG Approval to proceed to Detailed design stage.
Glenamuck/Kilternan Drainage & Water SchemeSLI
DESCRIPTION Sewer and watermain connecting Kiltiernan Village to existing network at Carrickmines and Ballyogan and servicing development lands at Glenamuck
STATUS Advanced works substantially complete. Main Scheme approved by DoEHLG and to commence March 2006 and expected to be complete by end of 2006.
Sandyford High Level Water Supply Scheme
DESCRIPTION Reservoirs and water distribution system to serve Sandyford
STATUS The Design Review for the scheme has been completed by the Councils Consultants and it is estimated that the Scheme will go to tender October 2006